Friday, April 9, 2010

Group's first drawing of project




This is our group's first drawing of our project.Basically,a small container is held to the metal bowl by scotch tape.The metal bowl carries the dirty water.In the diagram there are two curves at the end of the bowl.The first curve is the level of the dirty water and the second curve is the bottom of the metal bowl.We are still trying to draw the layer of ice cubes and the plastic around the bowl and on top of the ice.

No comments:

Post a Comment